Boring But Big is a supplemental template for Jim Wendler's 5/3/1 program. The base 5/3/1 method gives you three heavy work sets per session, waved across a 4-week cycle; BBB adds 5 sets of 10 reps of the same lift immediately after. The name is honest: doing fifty more reps of the exercise you just did is boring, and the size it builds is big. It is the default recommendation for anyone running 5/3/1 who wants hypertrophy alongside strength. What follows is the widely published base template - buy Wendler's 5/3/1 Forever or Beyond 5/3/1 for the full method.
The classic BBB layout is four sessions per week, one main lift each. Every weight in the program is a percentage of your Training Max (TM) - 90% of your true or estimated 1RM - never of your actual max. A typical week looks like this:
| Week | Set 1 | Set 2 | Set 3 |
|---|---|---|---|
| Week 1 | 5 reps at 65% | 5 reps at 75% | 5+ reps at 85% (AMRAP) |
| Week 2 | 3 reps at 70% | 3 reps at 80% | 3+ reps at 90% (AMRAP) |
| Week 3 | 5 reps at 75% | 3 reps at 85% | 1+ rep at 95% (AMRAP) |
| Week 4 (deload) | 5 reps at 40% | 5 reps at 50% | 5 reps at 60% |
The last set of weeks 1-3 is an AMRAP "plus" set: as many reps as possible, stopping 1-2 reps short of technical failure. On the deload week you do the main lift only - no AMRAP, no BBB sets. See 5/3/1 percentages by week for the full set-by-set breakdown including warm-ups.
The supplemental work is where BBB earns its name: 5 sets of 10 reps of the same lift you just trained heavy. The classic prescription is 50% of TM, and that is where everyone should start. It looks light on paper; by set four of ten-rep squats it will not feel light. Variants at 60-70% TM exist for advanced lifters who have adapted to the volume, and some run a "BBB challenge" ramping the percentage over three months - but jumping to 60-70% in your first cycle is the most common way to wreck recovery and stall the main lifts. Prove you can complete all 50 reps at 50% across several cycles before raising it.
After the main lift and the 5x10, add one or two simple assistance movements to cover what the barbell lifts miss - think chin-ups, dumbbell rows, hanging leg raises or leg curls. Wendler's guidance is 25-50 quality reps, not a second workout. A common pairing is press day + chin-ups, deadlift day + hanging leg raises, bench day + dumbbell rows, squat day + leg curls. He also recommends conditioning 2-3 times per week: hill sprints, prowler pushes or easy cardio on non-lifting days.
After each 4-week cycle, add 2.5 kg (5 lbs) to your upper-body Training Maxes and 5 kg (10 lbs) to your lower-body Training Maxes, then run the next cycle. Most lifters run BBB for 2-3 cycles (2-3 months) before switching supplemental templates, though it can be run far longer if the AMRAP sets keep moving and recovery holds up. If reps grind or you miss prescribed numbers repeatedly, reset that lift's TM to 90% of its current value and rebuild - the start 5/3/1 guide covers first-cycle setup in detail.
Always after. The 5/3/1 work sets are the strength engine of the program and must be done fresh. The 5x10 is deliberately performed fatigued - that is part of the stimulus.
Two-day and three-day 5/3/1 templates exist - the four main lifts rotate across the week instead of getting a day each, so a cycle takes longer to complete. The 4-day version is the classic BBB layout and the one to run if your schedule allows it.
Very little. One or two movements for 25-50 total quality reps. Between the heavy work and 50 supplemental reps, the session volume is already substantial - piling on a bodybuilding accessory circuit is the fastest way to stop recovering.
At least two 4-week cycles to see it work, and commonly 2-3 cycles before rotating to another supplemental template like First Set Last. As long as your AMRAP reps and estimated 1RM keep climbing, you can keep running it.
The full 4-day Boring But Big template is free in Hardy - enter your Training Max once and every 5/3/1 set, 5x10 weight and deload is calculated for you, cycle after cycle.
Get the RoutineDownload Hardy